Monday 25 August 2014

Bank Holiday Washout

The terrible bank holiday weather meant that we weren't quite able to finish the bedroom.

We still have one wall without skirting board (needs to be cut outside). My wardrobe door needs to be trimmed down now that the floor has been laid (needs to be cut outside). The headboard needs some alterations so that we do t have to mount it on the wall (need to be cut outside).... Spotting the pattern here?

We were able to put up some pictures and our two floating shelves, build our ikea bed and change the door handles in the built in cupboards.

So until it is actually finished here are some more pictures...



Wednesday 13 August 2014

Back to decorating...

I haven't posted for *ages* and if I am honest it is because I was just irritated with the whole house. After the loft insulation kept being delayed we just kind of lost motivation to get anything done.

The good news is that the loft is now insulated with lovely new, clean, fluffy insulation and we have boarded it out so my collection of Christmas ornaments can move out of the hallway!

The other good news is that our bedroom has been decorated - I feel terribly guilty to say that all I did was pick the colours and bought the paint. We paid someone to do the painting and papering (it feels terrible to have to admit that!).

Our reasons were twofold 1. We have never wallpapered anything, and weren't sure a ceiling was the best place to start... And 2. It had really become an issue not being able to do it, as we cleared it out months ago, but then because of the delay with the loft having a knock on effect with everything...

It does look good though!





More details when it is finished...

We are not planning on paying for any other rooms to be decorated - but the hallway and it's 15foot wall is another matter.